Deswik Suite 2026.1.2309

Description

Deswik Suite 2026.1.2309

Deswik Suite 2026.1.2309: Comprehensive Mine Planning Software

Deswik Suite 2026.1.2309 is a major stability update to Deswik's integrated mine planning platform, released as the first stable version of 2026. It focuses on significant performance gains, enhanced underground and open-pit optimization, and a modernized user interface for improved workflow efficiency .

Key New Features in 2026.1.2309

Performance & Hardware Optimization

  • 30%+ Faster Loading: Large models (10GB+) load significantly faster with optimized memory usage, supporting up to 128GB RAM for ultra-large mine models .

  • 50% Higher Frame Rates: 3D viewport rendering is optimized for OpenGL 4.6 and modern RTX graphics cards, dramatically improving visualization of complex scenes .

Underground Mine Planning Enhancements

  • Deswik.APEX Multi-Metal Optimization: Supports simultaneous optimization of multiple elements for extraction and blending in complex ore bodies .

  • Deswik.SO Algorithm Upgrade (SSO v2.1): Enhanced stope optimizer now handles complex ore body geometries and includes support for ground support constraints .

  • Ventilation Network Simulation: New dynamic airflow resistance calculation and fan scheduling optimization for improved underground environment management .

Open-Pit & Scheduling Improvements

  • Deswik.NOVA Multi-Pit Coordination: Enables coordinated scheduling and haulage optimization across multiple open pits simultaneously .

  • Dynamic Haul Route Optimization: Integrates real-time traffic and equipment status to dynamically adjust optimal transportation routes .

Download