GEODELFT MDrill 5.1.5.1

  • Size:18MB
  • Language:English
  • Platform:/WinNT/2000/XP
  • Freshtime:2009-10-20
  • Search:

Description

GEODELFT MDrill 5.1.5.1 enables the fast design of a pipeline configuration installed by the Horizontal Directional Drilling technique (HDD). In HDD three installation stages are considered:

  • Pilot drilling
  • Reaming the initial pilot borehole
  • Pulling back the pipeline

The initial borehole is called a pilot hole. The diameter of the pilot hole is enlarged using a reamer. Depending on the required final borehole diameter, the borehole can be enlarged in several steps using reamers of increasing diameters. Finally, the pipeline is pulled into the borehole.