ASPENTECH ASPEN ICARUS 2006 工程/商业决策评估

  • Rank:
  • Size:216MB
  • Language:Retail/Multilanguage
  • Platform:/WinNT/2000/XP
  • Freshtime:2008-04-09
  • Tag:
  • Counts: Download Counts:

Description

Aspen Icarus这个产品套件是一套一直专注于因应当前经济环境的挑战所设计的软体。目前,这个经济评估体系软体,它包含了下面一些相关的软体,而这些软体也同时被收集于Aspen工程设计套件之中,应用于过程评估,及生命週期的不同階段的評估與規劃。 Aspen Decision Analyzer – 決策分析器 Aspen Icarus Process Evaluator - 過程評估器 Aspen Kbase - Kbase應用程式介面 Aspen Icarus Project Manager - 項目管理器 Richardson International Cost Factors Manual – 經濟數據資料集 Richardson General Construction Estimating Standards –評估標準資料集 Richardson winRace Database –工程設計標準資料集

::::::English Description::::::

Aspen Icarus Process Evaluator (IPE) is a powerful project scoping tool that enables process engineers to evaluate the economic impact of their process designs (including generation of overall investment cash flow curves to quantify the contribution of the plant or the owner’s business). Aspen IPE is most valuable in the early phases of the conceptual design to compare competing technologies and/or evaluate alternative process configurations. It can expand unit operations from simulator output to equipment models using proprietary mapping technology, and calculate preliminary sizes for these equipment items.

Aspen Icarus Process Evaluator is a core element of AspenTech’s aspenONE™ Process Engineering applications.

Features

  • Interactive equipment sizing to determine operating costs and investment analysis
  • Automatic generation of block and process flow diagrams from the process stream information
  • Interfaces to all major process simulation tools, including Aspen Plus and Aspen HYSYS®
  • Based on the same Aspen Icarus technology used in both Aspen Icarus Project Manager™ and Aspen Kbase™

Benefits

Aspen IPE provides benefits across a broad range of industries, including refining, petrochemical, chemical, specialty chemical, pulp and paper, mining & minerals, pharmaceutical and food & beverage industries. Benefits include:

  • Evaluate lifecycle business impact of design alternatives in the early phases of conceptual design
  • Generate operating costs and investment cash flow curves to quantify a plant’s business contribution
  • Expand⎯through proprietary mapping technology⎯unit operating into actual equipment models and calculate preliminary sizes

Download-

  • Previous:HTRI Xchanger Suite 5.0
  • Next:ASPENTECH ASPEN ORION 2006
  • Relate Soft

      No information
    Letters A B C D E F G H I J K L M N O P Q R S T U V W X Y Z TOP